The order for Oil and Gas equipment consists in two Reactors (weighing respectively 700 tons and 400 tons) and one Hot High Pressure Separator Drum (230 tons), were shipped to the customer on time.
A critical supply for our client Technip who placed once again its trust on ATB Riva Calzoni.
The three pieces of equipment are made of Vanadium modified alloy steel and shall be installed soon at the core of the Hydrocracking Unit.
This is a further important success for ATB's Heavy Equipment Division in Egypt that reconfirms the expertise and capability of our company and the long standing cooperation established with Technip and strengthened during the years.