The erection of the 5.6m diam. penstocks for Nachtigal HPP has started!
The 9m long pipes are fabricated in the temporary workshop at site and erected to feed the 7 Francis hydro turbines.
Nachtigal Hydropower Project will cover 30% of Cameroon’s energy needs, further developing the Country’s sources of renewable energy. We're joining forces on this project with