Bottom Outlet for Nam Theun 1 Hydropower Project

ATB Riva Calzoni commissioned the Bottom Outlet at Nam Theun 1 Hydropower Project (Laos), 650 MW.

Bottom Outlet for Nam Theun 1

ATB Riva Calzoni is supplying the 10m diameter steel penstocks and the hydromechanical equipment of the dam under construction on a tributary of Mekong river, Laos.

The reservoir impounding is in progress, regulated by the recently commissioned Bottom Outlet.

Photo Gallery

Share this article!

Video

Recent posts

Popular posts