The first 60 kw Wind Turbine made ATB Riva Calzoni

The wind turbine, manufactured in the new site of Artogne, has shipped to the plant in Lercara Friddi, in the province of Palermo.

ATB 60 kw Wind Turbine

In the past few days, the first 60 kW wind turbines, one of four that will be installed in plants in the south of the country, in Sicily, Campania and Basilicata.

The wind turbine was manufactured in the new site of Artogne dedicated to clean and renewable energy, it has been opened in the beginning of March. The equipment is on the cutting edge of technology: materials and design absolutely always reflects the best tecnology there is on the market.

ATB Riva Calzoni can offer to the client a quality product with high added value. The wind turbine will be installed in just two days at Lercara Friddi, a hilly area near the city of of Palermo. The production phases of the equipment, such as assembly, site transport, installation and testing of turbines were entirely handled by ATB Riva Calzoni. 

Photo Gallery

Share this article!

Recent posts

Popular posts