Theun - Hinboun Hydropower Expansion Project 440 MW
THEUN - HINBOUN Expansion Project includes an expansion of the 220-MW Theun-Hinboun complex and the construction of the new 60-MW Nam Gnouang hydropower plant linked to a storage reservoir through Nam Gnouang Dam.
Both new powerhouses were commissioned in late 2012 and the hydropower project was inaugurated in January 2013.
List of main equipment:
- 3 penstocks
- 5 spillway radial gates
- 3 power intake gates
- 1 bottom outlet steel lining
- 1 bottom outlet gate
- 3 draft tube gates
- Stoplogs, Trashracks and Cranes