ATB Riva Calzoni is supplying the complete hydromechanical equipment package: starting from design, manufacturing, delivery at site, to supervision of final installation.
Massingir dam rehabilitation of bottom outlet works. ATB Riva Calzoni revamped the radial Gates of the hydroelectric power plant will feed the irrigated net of all Mozambique.
Cerro del Aquila hydropower Project, also known as Mantaro 3, is located in Peru and represents the third stage in exploitation of Mantaro River for energy production. The plant is positioned 11.7km downstream of restitution tunnel of the Mantaro 2 hydropower plant.
THEUN - HINBOUN Expansion Project includes an expansion of the 220-MW Theun-Hinboun complex and the construction of the new 60-MW Nam Gnouang hydropower plant linked to a storage reservoir through Nam Gnouang Dam.
Kárahnjúkar Hydropower Plant is located in Fljótsdalshérað municipality in eastern Iceland designed to produce electricity for the Alcoa's Fjardaál aluminum smelter.