Reactors for Eni refinery in Sannazzaro de' Burgondi

In the workshop set up in the refinery, works are being carried out on projects commissioned by Eni for the expansion of the petrochemical plant.

English Italian Spanish
Project: Reactors for Eni refinery
Company: ATB Riva Calzoni
Location: Sannazzaro de' Burgondi (Pavia)
Category: Oil and Gas Project
Customer: ENI SPA / ENI Progetti
End User: ENI SPA / ENI Progetti
Period: 2018-2019

ATB Riva Calzoni is engaged in two oil and gas projects that will lead to the expansion and implementation of the Eni refinery, in Sannazaro de’ Burgondi, Pavia. The first job, on behalf of Eni Spa, concerns the design, construction, and supply of a D2301n reactor that will serve to increase the refinery's potential, which is currently able to produce more than 10 million tons of crude oil every year.

The second job, commissioned by Eni Progetti, will require the engineering and manufacture of two separators to be installed in the so-called EST section (Eni Slurry Technology), an annex of the refinery created in 2013, which using an innovative technology recovers the processing waste to obtain pure products such as naphtha, valuable middle distillates, and diesel oil. The particularity of this job consolidates a relationship with Eni which began more than ten years ago, is all about logistics.

The transport limits in force on Italian roads with regard to exceptional loads have forced the company to find an alternative solution that would allow the intervention to be carried out in compliance with the schedule established by the customer. The company has set up a temporary workshop, equipped with machinery for assembling the shells directly on site. The temporary yard that ATB Riva Calzoni set up in January 2018 to simplify the assembly operations of the equipment and that will remain active until the beginning of 2019.