RAPID - Package OUI Project

Supply of 16 Filter Tanks

English Italian Spanish
Project: RAPID - Package OUI Project
Company: MMHE-ATB
Location: Malaysia
Category: Oil and Gas Project
Customer: ARTES Ingegneria S.p.A
End User: PETRONAS PRPC
Period: 2017

Supply of sixteen (16) Filter Tanks with a total fabrication weight of 380 tons. The Filter Tank ID is up to 6,500mm and height is up to 6,400mm.

The Refinery and Petrochemical Integrated Development (RAPID) project is part of PETRONAS' Pengerang Integrated Complex (PIC), designed to have a 300,000 barrels per day oil refinery as well as a petrochemical complex with an annual capacity of 7.7 million tonnes a year.