RAPID - Re-gasification Terminal 2 (RGT2) Project
Supply of 11 Pressure Vessels
Supply of eleven (11) Pressure Vessels in carbon steel and stainless steel material with a total fabricated weight of 360 tons and thickness of up to 32 mm.
RGT2 Project is to provide primary gas supply to the RAPID, Pengerang Cogeneration Plant (PCP) and the Peninsular Gas Utilization (PGU) grid to augment the availability of gas in the country.
The RGT2 will offer LNG unloading and reloading, storage, handling and regasification. The plant will have a capacity of 3.5 mtpa and will be connected to PGU via the Pengerang Gas Pipeline (PGP).