Infrastructure for the Broadband Connectivity 2 program
The contract consisted of the final design and execution of all work and the provision of all supplies necessary for the installation of five sections of the fiber-optic network providing broadband and ultra broadband connectivity to the most significant mountain urban areas, the Valle del Panaro, and in particular the right side of the valley in the municipalities of Guiglia, Marano sul Panaro, Montese and Zocca, as well as nine access points to the fiber optic network and relative sections based on the final design prepared by Lepida.
The infrastructural intervention involved the laying of 28,262 meters of fiber optic cabling, distributed along five different sections to connect the municipalities of Guiglia, Marano sul Panaro, Montese and Zocca in the Modenese Apennines by the end of 2017.
The value of the contract was €2 million.